I got home from work to find that lots had been done through the day. Just look at it now.
Stephen took a couple of photos during the day to send to me at work. At this point they’d put down the weedproof membrane.
They did a great job, tucking it under the enclosure so no weeds could come through and it’s tucked under the sleepers outside the enclosure too.
Talking of sleepers, don’t these look so much better than those old bricks that were on the verge of falling down.
And there are more sleepers supporting the slabs on the other side.
They’ve made a start on putting the hardcore down inside the enclosure, ready for the slabs and turf.
So far we’re really pleased with their work. I can’t wait to see what it looks like tomorrow night!
September 12, 2017 at 8:53 AM
this is going to be brilliant for the wet weather, protected by the roof from the rain
LikeLike
September 12, 2017 at 9:31 PM
Sadly the roof is made of the same stuff as the sides, so no protection. If it gets wet from the rain it also has a tendency to suddenly shower the cats if they jump about and knock the supports LOL
LikeLike
September 11, 2017 at 9:53 PM
Wow – they work fast! It is going to look amazing
LikeLike
September 12, 2017 at 9:31 PM
I know. I can’t wait to see it done now.
LikeLike
September 11, 2017 at 8:45 PM
Exciting
LikeLike
September 12, 2017 at 9:31 PM
Very 🙂
LikeLike
September 11, 2017 at 8:38 PM
Major progress!
LikeLike
September 12, 2017 at 9:32 PM
Yes. I can’t believe how much they got done, especially considering the weather.
LikeLiked by 1 person